Dragonberry Produce Expansion
Perlo's second project for Dragonberry Produce was a campus expansion featuring a new tilt-up concrete distribution center adjacent to the original facility.
  • Location: Canby, Oregon
  • Architect: Deca Architecture
  • Owner: Dragonberry Produce

The building includes a 6,100 SF cooler and a 2,500 SF freezer with high-speed doors, a natural gas generator, and two high-end office areas with a future separate tenant build-out area for nut processing. The site includes multiple loading docks, two swales and drywells for storm water management, a truck scale, and custom zen garden landscaping.

During the preconstruction process, Perlo worked extensively with the owner to achieve their desired budget, as well as identifying the long-lead materials.