Our team engaged in extensive site work for this 60,000-square-foot facility that encompasses two water quality infiltration ponds, two dry wells, 67 parking stalls, and a future expansion area. The newly constructed warehouse features 8″ concrete slab on grade with eight drive-through doors, four crane bays, and exterior LED lighting. In addition, the warehouse includes five concrete equipment foundations with sloped trenches and a circular-formed pit that’s accessible from the slab crawl space and adjacent manhole.
Premier Gear & Machine Works
Tilt-up concrete building with 54,000 square feet of fully conditioned warehouse space that houses over 30 cranes.
- Location: Canby, Oregon
- Architect: Mackenzie
- Owner: Stratus Development