In order to make space on the property, the team had to move 60,000 yards of material. Inside, half of the building is conditioned with epoxy floors and sprinklered racking featured throughout.
In addition, the water quality swale on site was doubled in size, the existing fire line was extended to the hydrant, and a new fire line was installed to the building.